Order & safety

What it is and when to use it

Without a structured review, an owner usually finds out what their worst operational risk is after it already happened — an injury, a fine, a spill, a shutdown. This matrix walks every task or area, scores likelihood and severity, and points a limited safety budget at the two or three risks that actually matter.

Worked example

Risk matrix worksheet filled in with a worked example. Conclusion: Chemical storage scores 20 (4×5) — the highest risk in the shop, with no engineering control yet. Sections: 5×5 matrix · where each risk falls, Risk register, Hierarchy of controls, Result and action.
A chemical storage 4×5 high · B handling 3×3 moderate · C panel 2×2 low after LOTO

Click or tap the plate to enlarge it.

Download the blank template (PDF)One page. Print it and fill it in with your own numbers.

What goes on the sheet

  1. Task/area/process evaluated
  2. Hazard identified, by category: mechanical, chemical/environmental, ergonomic, electrical, fire
  3. Who or what is exposed: operator, community, environment, equipment
  4. Existing controls, and likelihood / severity scored 1-5 each (severity includes environmental impact, from contained on-site spill to reportable release)
  5. Risk score (likelihood × severity) and color-coded risk level (low/medium/high/critical)
  6. Recommended additional controls, following the hierarchy: eliminate, substitute, engineering control, administrative control, PPE
  7. Owner, target date, residual risk after controls

In a business like yours

  • Pool service company: chemicals, ladders and driving scored side by side, so the top risk gets fixed first.
  • Restaurant kitchen: hot oil, knives and wet floors ranked by likelihood and severity.
  • Small shop floor: which machines need a guard or a lockout before the next hire starts.